Product Details
Full Auto C Z purlin Roll forming machine use Hydraulic hydraulic motor instead of normal power, that can save the working power , the size changing and C to Z changing driving by motor control by PLC , automatic adjustment method can let your stuff finished different specification Purlins.
Profile drawing for reference:
Technical Farameters
Processing Flow
Fully Automatic CZ Purlin forming Machine
|
|
Raw Material
|
PPGI,PPGL
|
Material thickness: 1-3mm( 15-9 gauge )
|
|
Coil width :150-500 mm adjusted
|
|
Machine Frame
|
Machine base frame is made of U beam weld steel. In the main roll forming machine, there are 2 buttons for urgency stop in case any malfunction happens.
|
Material Of Rollers
|
High grade 45# forged steel
|
Roller material: Cr12 CNC processing heat treatment to HRC: 58-60 ,finish turning
|
|
Forming Stations
|
Roller stations :20 rows
|
Diameter Of Shafts
|
Φ75mm solid
|
Material Of Shafts
|
40 Cr CNC processing HRC28-32 ,finish turning and electroplate
|
Forming Speed
|
Max 30 m/min
|
Voltage
|
380v/50hz/3p (As Requested)
|
Transmission Way
|
By 1.5 inch chain
|
Hydraulic Power
|
30KW (WK series Hydraulic motor)
|
Cutting Blade Material
|
Gcr12 quenched treatment
|
Cutting Type
|
hydraulic post cutting
|
Control
|
Sizes adjust by PLC control and button
C and Z section changing by PLC control
|
Machine Detailed Pictures
Each components can be designed as custom require . Longway roll forming machine provides OEM/ODM for all customers
Applications
C purlins, also known as Cee purlins, are in the shape of the letter C and provide structural support for beams required for walls and flooring. In addition to roofing, C purlins are often used for structural support in walls and as floor joists
Related Machines
LONGWAY valuable customer
-
Chile
-
lran
-
Philippine
-
South Africa
Package and Delivery
1 .Spraying anti-corrosive oil on rollers to prevent rollers oxidation during shipping
2.Packaging isolation film whole machine to prevent machine oxidation during shipping
3.Reasonable space planning to reduce transportation costs for customers
4.Fixed well to prevent machine damage during transit period
Factory Display